Yesterday I've replaced the complete hydraulic harness in the roof shell of another Z4.
It's like an operation on the open heart respectively in the trunc.
2 harness, old and new
Y-structure for both sides, connected in the trunc
the visible length is about 3.5m on both wings
24m of hydraulic lines on each harness
Temporarily 2 harness in the car, 2x24m=48m hydraulic lines in the trunc!
Last edited by RobbiZ4; 08-13-2019 at 05:19 PM..
|